Backyard Drainage Solutions That Protect Your Foundation
Backyard drainage solutions start with grade: code requires 6 inches of fall in the first 10 feet of your foundation. Diagnose the wet yard, then fix the cause.

Backyard drainage solutions start with grade: code requires 6 inches of fall in the first 10 feet of your foundation. Diagnose the wet yard, then fix the cause.

As-built drawings show what was actually built, not what was designed. Learn how they differ from record drawings, when they're required, and why you need one.

A land disturbance permit is triggered at just 50 sq ft in DC but 10,000 sq ft in Virginia. See the DC, MD, and VA thresholds, required plans, and penalties.

A stormwater management plan controls runoff on DMV projects. In DC, sites disturbing 5,000 sq ft must retain the 1.2-inch storm. See the state rules.

Got a DOEE erosion and sediment control plan review comment? In DC an ESC plan is required above 50 sq ft of disturbance. Here is how to clear it fast.

An erosion and sediment control plan is required at 50 sq ft in DC, 5,000 in MD, and 10,000 in VA. See the DMV land-disturbance thresholds and what one needs.
From Feasibility to Final Permit.
Licensed in DC | Maryland | Virginia | Florida
Address: 7181 Lee Hwy, Falls Church, VA 22046, United States
Email: [email protected]
Phone: +1 202-998-5445
monday: 8am - 5pm
tuesday: 8am - 5pm
wednesday: 8am - 5pm
thursday: 8am - 5pm
friday: 8am - 5pm
Copyright 2026. BOZ Engineering Group. All rights reserved.